The December drop off date for the Paint Swap will be the first Tuesday, Dec 7th instead of the regular second Tues of the month. The time remains the same – from 4pm to 6pm at Village Hall. To donate
Henry W. Dubois Drive Pedestrian and Bicycle Improvement Project
Alta Planning + Design has submitted the draft design report for the Henry W. Dubois Drive Pedestrian and Bicycle Improvement Project to the NYSDOT and subsequently posted the report and all appendices to the project website. There is a two-week public
East of Wallkill EOC Contractor Bid Opening 11/20/20 2pm
The public bid opening for Contractor Services for the East of Wallkill Emergency Operations Center on November 20, 2020 at 2 PM can be viewed live on youtube at this link: https://youtu.be/mfRputRC8B8. Comments and questions can also be submitted through youtube’s
Village Hall Eco-scaping Project
The New Paltz Bee City Project in collaboration with Future Fruits is excited to be hosting a public landscaping & design session for the New Paltz Village Hall! This session is an opportunity for you to have your voice heard
East of Wallkill EOC Contractor Bid: Date Change
The due date for bid proposals for Contractor Services for the East of Wallkill Emergency Operations Center has been changed from November 12, 2020 to November 20, 2020 at or before 2 PM. The initial Notice to Bid (including RFI, bid package, and
East of Wallkill EOC Contractor Bid: Date Change
The due date for bid proposals for Contractor Services for the East of Wallkill Emergency Operations Center has been changed from November 5, 2020 to November 12, 2020 at or before 2 PM. The initial Notice to Bid (including RFI, bid package, and
MS4 Annual Report
The MS4 Annual Report for the period ending March 9, 2020 is now available and can be found on our Stormwater Management / Municipal Separate Storm Sewer System (MS4) Development page. Click here to view the 2019-2020 MS4 Annual Report
MS4 Annual Report
The DRAFT MS4 Annual Report for the period ending March 9, 2020 is available for review and comment. Comments should be directed to the DPW Superintendent, Blue Terwilliger at dpw@villageofnewpaltz.org. Click here to view the 2019-2020 MS4 DRAFT Annual Report
Request for Proposals: Website Redesign
The Village Board and Town Board of New Paltz are seeking a website redesign that streamlines the user experience of each website and creates cost savings for both municipalities. There is a hard project completion date of Monday, January 7th,
Wastewater Treatment Plant Review for 5/16 Village Board Meeting
“Wastewater Treatment Plant Review and Remaining Capacity Study” Executive Summary